Are you planning a bathroom renovation, but you’re unsure of how long the process will take? At PHS Bathrooms, we know that timing is everything. While every project is unique, a standard high-quality bathroom renovation in the UK typically takes between 2 to 4 weeks from the first day of rip-out to the final finished project.
Below is a breakdown of the PHS Bathrooms timeline to help you plan your project.
Before your renovation properly begins, the planning phase ensures your project runs smoothly.
Once you’ve confirmed your final design, we can then place your order.
Pro Tip: We always advise on specific lead times at the point of order so there are no surprises.
The actual “on-site” work usually follows this pattern:
At PHS Bathrooms, our design team works closely with you from the first measurement to the final installation. If you have a specific deadline simply let us know. We will do our best to achieve your desired timeframe without compromising on the luxury finish.
Can I use my bathroom during the renovation? Usually, the bathroom will be out of action for the duration of the 2-week install. We recommend making alternative arrangements if it is your only bathroom.
Is 4D design necessary for a quick turnaround? Yes. Using our design service helps prevent mid-project changes, which is a common cause of renovation delays.
Do you serve areas outside of Milton Keynes? Yes, we provide full design and supply services across Buckinghamshire and surrounding areas.
Transform your bathroom in 2026. From first measurement to final fit, we handle it all.
A small bathroom can often feel cramped and cluttered...
Click to see the product configurations available for this bathroom display.
Click to see the product configurations available for this Arysto bathroom display.