For this client, we renovated four bathrooms in their house including the third of the series which was their spare room ensuite. In this case study we are featuring their bedroom ensuite bathroom renovation. If you’ve read our recent case studies (which you can see here)
, you’ll know that our client’s project originally began in 2020. After lockdown lifted, they returned to the showroom to continue their project. A cloakroom, family bathroom, spare room ensuite and and master bedroom ensuite were completely renovated in this home. Taking inspiration from displays in our showroom and speaking to our designer Chris, they decided on the following for this particular ensuite.
Over the past couple of weeks we have been sharing each of the rooms in this home that we renovated for our client. Following their visits to the showroom for their CAD with Chris (our designer) they discussed their wishes for all their rooms. The first of this series was the downstairs cloakroom, the second was their family bathroom and today’s third is their spare bedrooms ensuite. For this room, they wanted a bath with a shower over the bath and ample storage in the room. To best utilise the space in the room, the Grohe shower was installed over the Bette Select bath on the opposite side of the room to the sloped ceiling. A folding Roman shower door was installed as well. As you’ll notice with the designs of each of the rooms, they are very similar as our client wanted each of the rooms to have continuity such as the same styles and tiles used in each room.
In the final design for this ensuite, they chose the same Ruggine Platino wall tiles, Ferroker Platino floor tiles and Tribal Pearl White tiles for the windowsill and bath panel, all from Porcelanosa which were used in all of their new bathrooms.
Laufen sanitaryware, along with a Geberit flush plate were installed.
A Laufen compact basin and vanity unit was installed with a Grohe mixer tap in chrome.
Finally, a Hib Eris mirror cabinet was installed (which provided a great storage solution) as well as a Jis Ansty towel rail was installed to finish off this ensuite bathroom.
Throughout this year we have completed multiple bathroom projects, which we share in this article and on our social media platforms and website – which you can see here.
If you’re thinking of giving your bathroom a makeover, you can reserve a booking to ensure your lead times aren’t prolonged. Visit our showroom to enquire about this service we offer.
Keep an eye on our social media pages for the remainder of this series of bathrooms, which will also be featured here as well over the next few weeks.
Brands used in this bathroom: Laufen furniture and sanitaryware, Bette bath, Porcelanosa tiles, Grohe brassware.
For all four bathrooms in this home, they took 8 weeks to complete.
" Chris renovated all four bathrooms in my home and I’m so pleased with them all. "
The duration of a bathroom renovation can vary widely depending on the scope of the…
Upgrading your bathroom can bring a variety of benefits that enhance your lifestyle, improve functionality…
Have you considered installing an additional bathroom in your home but you're not sure if…
Are you thinking about starting your bathroom renovation journey? If you’ve been considering giving your…
Does your bathroom delivery keep getting delayed? We've recently been experiencing an increasing number of…
Having been established since 2005, we have grown from a local, family-run business to one…